Recent Work

Project: 1/0

phot. By | Al's Accurate Electric, Inc. ©

Power Switch

Commercial - Downers Grove

Location: Jakes Mechanic LLC.
Owner: Jake Stanley

Newly installed hydraulic car lift. 220v dedicated circuit to existing electrical panel.

Estimated Hours: 4 hours of labor. Depending on the job we require that the customer be present to facilitate access to the are and also electrical room.

The customer was satisfied with the service.

phot. By | Al's Accurate Electric, Inc. ©

Outdoor Lighting

Residential - Bolingbrook

Location: Robert Recidence.
Project: Outdoor Light Post

The project took about 6 hours from start to finish

Estimated Hours: 5 hours of labor.

We first had julie come out the weekend before and flag the power, gas,and water lines. After we dug a trench about 16 inches deep, we ran our underground piping and installed the post. The post was mounted on an existing concrete base.

phot. By | Al's Accurate Electric, Inc. ©

Vanity Mirror

Residential - Naperville

Location: Julians Recidence.
Project: Install vanity mirror and power

The project took about 3 1/2 hours total

Estimated Hours: 3 hours of labor.

We first ran the electrical to the back of the mirror then we installed our switch and connected the power.

The customer was satisfied with the service.